SCHEDULED POWER INTERRUPTION (APRIL 16, 2026 from (9:00 AM to 5:00 PM)

Please be informed of the Power Interruption on APRIL 16, 2026 from 9:00 AM to 5:00 PM.

REASON: Clearing of Vegetation along the Line

AFFECTED AREAS:   

FEEDER 7

SIPOCOT 
Impig, Alteza, Bolo Sur, Bolo Norte, Paitan, Cabuyao, Sagrada, Bulan, South Villazar, North Villazar, Salanda, Sta. Cruz, Calagbangan, Vigaan, Salvacion, Serranzana, Tula-Tula, Anib, Calampinay, Cotmo, San Vicente, Tampian, Tible

LUPI 
Sooc, Alanao (San Jose), Bahi, Napolidan, San Ramon, Belwang, Polantuna, San Rafael Norte, Part of La Purisima

FEEDER 8

SIPOCOT 
South Centro, North Centro, Awayan, Azucena, Malaguico, Part of Manangle, Malubago, San Isidro, Mangapo, Manga, Mantila, Yabo

LUPI 
Part of Poblacion, Part of Tapi, San Pedro, Barrera Jr., Barrera Sr., Caibigan, Cristo Rey, Haluban, Part of Lapurisima, San Isidro (Bagangan Jr.), Bagangan Sr.

CABUSAO 
Barcelonita, San Pedro, Part of Biong

LIBMANAN
Awayan, Candami

Note: Power will be restored any time after the completion of the said activity, so please consider our lines always energized